Thursday, 29 March 2012

Editing the thriller

Finally today on the 29th march we have finally finished editing our thriller we only now need to make sure the music is is more sync with what's going on in the picture, in total after all of the editing we have done there is 3minutes and 50 seconds of footage, but is still quite long and may need tweaking or cutting down depending on what the rules are, i feel like our thriller is suitable for all age groups and Theres no specific genre we have made it towards.


Monday, 26 March 2012

Problems while filming the thriller


Problems we faced when filming our thriller was the filming process took over 3 days but the first problem being the weather changed and because our thriller is based outside in the day time the littleness things like the clouds also cars in the car park one minute there was one and then there was more.

The way we resolved this was by being patient and waited for the perfect moments to arise, there was still little bumpy touches like there was more cars in the car park then there originally was but what we did was we filmed round it, and not getting the cars in the film.

Our thriller surroundings



These images are what we are filming are thriller based movie. It's based on top of a car park because it feels remote and it was very quiet just like what a thriller usually is about.

Wednesday, 21 March 2012

health and safety and risk assessment


  • No filming in inappropriate locations
  • Check safety of locations e.g. roads.
  • Minimise risk of theft of equipment
  • When filming on loction ensure teacher or responsible adult know where you are and have telephone number and when you will return
  • Check all equipment is working before you leave
  • Ensure you have permission for filming if necessary
  • Always film with at least one other person
  • Ensure you have the permission of those you are filming.
these are some of the health and safety issues we need to be aware of and rules we must abide by

risk assessment for filming coursework

Programme Title - Still yet to be decided
Client - Robert Clack School
Writer - Dale Stevenson
Producer - dale Stevenson
Director - Tommy Glanville
Actors- Dale Stevenson, Ryan mart
Major Issues - We are filming along the street & the possible risks are; 
  •  Traffic
  • Weather
  • Permission of private property
  • Theft
  • Safety(of everyone around us)
Solutions - The solutions for these issues are;
  • Having a lookout to watch over the traffic, parking cars etc.
  • Check the weather before going out to film, so that the camera does not get ruined.
  • Having 2 people with the camera at all times 
  • Regular contact
Contacts - The people we can contact in case of any emergencies are;
  • The School
  • Parents
  • Friends
Emergency Services - The local emergency services avaliable are;
  • Metropolitan Police at Dagenham East
  • Queens Hospital

Sunday, 18 March 2012

Thriller characters

the two characters we plan to have for our thriller are 2 mysterious loners one will be chasing the other as he as the antagonist and the protagonist will be desperately trying to get away from the other we have not given them names as we don't want to reveal much about the narrative in the opening scene but I wil play one of them and Ryan Martin will play the other one will be wearing a white shirt and the other a black to give the characters contrast and to differentiate between god and evil

Saturday, 17 March 2012

animatic


This is our animatic of our original storyboard drawn again very poorly by Ryan Martin